Application Report - Demolition of heavily reinforced concrete
Wall demolition - steel reinforced concrete pit demolished

The Job:
A large concrete pit had to be demolished. The pit
measured about 2.5 m deep, 4 m wide and 12 m
long. The concrete walls, around 30 cm thick, were
reinforced with medium-duty steel rods.

The solution:
Der Demolition was carried out with a C 9 N
splitting cylinder and an EP-type electric motor
unit. First, vertical and horizontal holes were
drilled at intervals of 0.6 - 0.7 m with a DR 086
mini drill rig. Following this, the concrete was split
piece by piece at every second or third drill-hole,
first horizontally, then vertically with a single
C 9 N splitting cylinder.

During this process, the reinforcing rods snapped
off, resulting in pieces of concrete measuring
around 0.6 x 0.6 m which the workers were easily
able to remove. The entire operation was completed in only 1.5 working days.
Applications Report Overview
Demolition of concrete and
lightly reinforced concrete
Demolition of heavily
reinforced concrete
Wall demolition
Ceiling demolition
Bridge demolition
Foundation demolition
Cutting concrete pillars
Interior demolition work
Demolition in a restricted
a space and hard to
reach areas
Tunnel enlargement
Miscellaneous