Application Report - Demolition of Rock and Natural
Stone
Tunnel Work- driving
a tunnel through a rock ledge
The Job: This operation involved driving a narrow tunnel
(20 m long by 1.5 m square) through a rock ledge for a sewage pipe.
The requirements: Two houses had been built on the rock ledge. For
this reason explosives could not be used. Similarly, large mechanical
demolition tools would not fit in the narrow tunnel. The rock was
also too hard for a Hand-held demolition hammer.
The solution: Only with a Darda hydraulic rock and concrete splitter
was it possible to excavate the tunnel without creating dust, noise
or vibrations and without putting the houses at risk. furthermoer,
the splitter was able to break down the hard rock without difficulty
since the Darda splitter applies force inside the material itself.
In this case, one C 11 SL splitting cylinder and a mobile A1-type
compressed air motor unit were used. Two workers carried out the drilling
and splitting, while a third removed the pieces of rock. They completed
the tunnel in just under forty days.